N1 BLOEMFONTEIN / COLESBERG (Example only) K11 / L10

The road is potholed and very uneven in places. Ongoing patching operations will occur with possible Stop/Go control in operation.

Rehabilitation is also in progress and motorists are advised to exercise extreme caution and obey all designated signs. Construction is

in progress between Springfontein and Orange River bridge with Stop/Go control in operation. Delays of ± 15 minute can be expected.

IMPORTANT NOTICES

Eskom Load Shedding

Motorists are advised to proceed with caution and treat all non-functioning traffic lights as four-way stops. For Eskom's

Load Shedding Schedule please log onto www.eskom.co.za

Safety

Due to the increasing amount of vehicle hi-jackings, motorists are advised to keep their doors locked and windows

closed at all times when travelling and to stay alert. Whatever happens, try to keep calm and don't endanger you and

your passengers'lives unnecessarily. A car and other possessions are valuable, but they can be replaced, a human life

cannot.

DISCLAIMER

This Road Report, compiled and issued by the AA, is based on information collected and received from various external

sources such as road, traffic and police authorities, contractors responsible for road maintenance, and AA members.

Travellers should remember that weather conditions and other factors can quickly affect road conditions and the report could

therefore change unexpectedly.

The AA takes all reasonable steps to ensure the information is correct and up to date. However, we cannot accept

responsibility for any omissions or errors in it, nor are we responsible for damage, delays or disappointment that might occur

during the course of your travel. The information is used at your own risk.

Information is researched and compiled by Road & Touring Information Team:

Bokang Seroka, Corné van der Merwe, Jill Nyelele, Khawulani Nkuna, Layton Buites & Mogobo Kgomo.

CAPE TOWN & SURROUNDS

BORCHARD'S QUARRY ROAD / VANGUARD DRIVE & BADEN POWELL ROAD

Incidents of stone-throwing have previously been reported on Borchard's Quarry Road near Cape Town International

Airport, as well as on Vanguard Drive and Baden Powell Road. Motorists are advised to be vigilant and to exercise

caution at all times. Major construction is also in progress between Borchard's Quarry and Modderdam Roads. Expect

delays during peak hours.

M4 MUIZENBERG / KALK BAY

Major upgrade of the road is in progress and motorists could encounter heavy delays. Stop/Go controlS are in operation.

Alternative routes are via Ou Kaapse weg or Boyes Drive.

M6 CHAPMAN'S PEAK DRIVE

Currently closed for routine maintenance and repairs. The alternative route is via Ou Kaapse Weg, which has been

reopened.

R300 BETWEEN THE N1 AND N2 NEAR CAPE TOWN

Rehabilitation of the road is in progress. Lane closures, delays and speed restrictions may be encountered. Expected

date of completion is June 2010. Beware of pedestrians. Incidents of stone-throwing have been reported.

R300 @ KUILS RIVER

Off-peak roadworks may be encountered with lane closures and Stop/Go control. Bridge construction is also in progress

just north of Stellenbosch. Exercise caution.

Refers to road

or route number

Refers to towns or reference points between

which the incident exists as well as incident

information

Refers to reference grid on

AA MAP: South Africa MN 11

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page2

N2 KAYELITSHA

Beware of pedestrians and stray animals. Past incidents of stone-throwing and tyre burning have also been reported.

DURBAN

IMPORTANT NOTICE

Repairs are still in progress and delays may be encountered. Stop/Go control. In the Umzinto area the Umzinto Bridge to

Ghandinager Township has been washed away –a diversion is in use.

KLOOF FALLS / BRIDLE ROADS CLOSED

Due to rehabilitation of this road, it will be closed to traffic between Link Road and Abelia Road from 1 April 2009 until 30

June 2009.Residents only will be allowed at all times. Rehabilitation work will be undertaken from 08:00 –16:00.

OLD DUTCH ROAD

As a result of construction of the new Warick flyover, the road is currently closed at Warick avenue.

JOHANNESBURG

IMPORTANT NOTICE

Commenced in June 2008 the Gauteng Freeway Project will continuously be busy with major upgrades to

national roads and interchanges in Johannesburg & Pretoria. Expected duration 30 months.

Upgrading will take place on the N1 from Soweto to the N4 in Pretoria, the N3 from Alberton to the Buccleuch

interchange; sections of the N12 south of Johannesburg and the N12 & N3 from Gillooly's interchange to the R21 in

Boksburg. Construction will take place throughout the entire day. Expect major traffic disruptions and delays.

Attempts have been made to enforce lane restrictions during off-peak hours only. The major upgrades along the N1

will take place at the William Nicol / Rivonia / Allandale / John Voster and Lynnwood exits. On the N3 and the N12,

the Elands & Gillooly's interchanges will be affected. Expected date of completion is end of 2010. Once completed

these route are expected to be tolled.

CENTRAL JOHANNESBURG NELSON MANDELA BRIDGE NORTHBOUND

A lane restriction remains in place after earlier construction work on the bridge - expect delays between Newtown and

Braamfontein

GAUTENG SOWETOCHRIS HANI ROAD

Road works can be encountered after the Maponya Mall due to the RBT projects. Sever traffic congestion can be

expected.

OR TAMBO AIRPORT

The new central terminal building is now in operation. Passengers for domestic and international flights are advised to

arrive 20 minutes earlier than normal to locate the new check-in terminals.

GAUTRAIN PROJECT –JOHANNESBURG CBD

There are roadworks in the Johannesburg CBD area for the new bus lane. Expect delay during peak traveling times.

GAUTRAIN PROJECT - SANDTON

Traffic on Rivonia Road between 5th and West Streets are diverted during construction of the Sandton Station.

GAUTRAIN PROJECT - MODDERFONTEIN

Bombela Civils Joint Venture has commenced with the construction of Centenary Way East in Modderfontein. The

existing Centenary Way will be permanently closed between Ardeer and Modderfontein Roads, due to a portion of the

road traversing through the Gautrain alignment. Access to Modderfontein will be through Modderfontein Road and

Johannesburg Road, whilst access for residents and pedestrians will be maintained at all times. Centenary Way East will

be opened in May 2009.

GAUTRAIN PROJECT - LOVATO ROAD IN SPARTAN

An overpass bridge will be constructed at Lovato Road in Spartan, Kempton Park. The works will necessitate the closure

and deviation of a portion of Lovato Road, in the proximity of the intersection with Plane Road. The Bombela construction

will be implementing Phase II of the road diversion along Green Avenue (Chestnut). Traffic travelling on the eastern side

of Green Avenue Bridge will be diverted to the western side of the bridge. A single lane in both directions will be

maintained. The permanent closure is expected in May 2009.

N1 BRAKFONTEIN INTERCHANGE TO BUCCLEUCH

Construction of six lanes and upgrade of interchanges. Lane restriction may apply in off peak hours. Expected date of

completion is December 2010.

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page3

N1 ALLANDALE / BUCCLEUCH INTERCHANGES

Motorists are able to use the emergency lanes during congested periods. Sections of the road have been clearly marked

and electronic overhead signs indicate if the lane is open (green arrow) and may be used or closed (red cross).

N1 BUCCLEUCH / SOWETO

Construction of six lanes and upgrade of interchanges. Lane restriction may apply in off peak hours. Expected date of

completion is December 2010.

N1 WESTERN BYPASS

Routine maintenance work is in progress from Rivonia Road to 14 Avenue. Lane closures and traffic disruptions may be

encountered during off peak hours. Repairs are in progress on the Ben Schoeman highway between Buccleuch and

Brakfontein Interchanges.

N1 ROODEPOORT

Bridge construction works with lane restrictions between the Main Reef Road bridge and the Soweto Highway exit

expect peak-time delays in both directions

N1 DIEPKLOOF

Roadworks - expect delays through the construction area between the Golden Highway exit and the Rand Show Road

Interchange

N1 JOHANNESBURG / PRETORIA

Construction of additional lanes and other improvements from R21 interchange up to Atterbury Interchange.

N3 GELDENHUIS INTERCHANGE TO BUCCLEUCH INTERCHANGE

Construction of six lanes and upgrade of interchanges. Lane restriction may apply in off peak hours. Expected date of

completion is December 2010.

N3 HEIDELBERG WEG INTERCHANGE TO GELDENHUIS INTERCHANGE

Construction of six lanes and upgrade of interchanges. Lane restriction may apply in off peak hours. Expected date of

completion is December 2010.

R24 / N12 SPLIT AFTER GILLOOLY'S UP TO THE R21 TOWARDS OR TAMBO INT AIRPORT

Roadworks in progress at night and during off-peak hours. Lane closures and delays may be encountered. Allow

additional travelling time between Pretoria and the Airport. Alternative routes are recommended.

N12 READING TO ELANDS INTERCHANGE

Construction of six lanes and upgrade of interchanges. Lane restriction may apply in off peak hours. Expected date of

completion is December 2010.

PRETORIA

HILDA STREET BRIDGE (PRETORIA)

Hilda Street Bridge in Hatfield will be extended. Upon completion, the bridge will serve as an overpass carrying traffic

across the South African Rail Commuter Corporation (SARCC) and Gautrain alignments. The extension of the bridge will

take place in two phases from 02 February 2009 and is expected to be completed in July 2009.

Phase I - Construction works will commence along the westbound carriageway. Hilda Street will be reduced from two

lanes to a single lane between Park and Arcadia Streets. Traffic close to the construction site will be controlled by stop–

go traffic management. A temporary traffic island will be constructed at the intersection of Park and Hilda Streets to

prevent motorist from turning right from Park Street into Hilda Street. Phase II - Works will be carried along the

eastbound carriageway. Traffic will be deviated onto the newly extended westbound carriageway. Hilda Street will

remain one lane with stop –go traffic management being implemented.

N14 BEN SCHOEMAN CARRIAGEWAY

The Bombela construction team is preparing to implement Phase II of the deviations along the Ben Schoeman Highway,

north of the Eufees Road exit. Over the past few months, southbound traffic has been deviated onto temporary lanes to

allow Bombela to construct a cut and cover structure that will carry the Gautrain beneath Ben Schoeman. Phase I of the

construction works affecting the southbound lanes has been completed, and will result in traffic along the southbound

carriageway being reinstated to its original position. Phase II of the construction works, which will affect traffic along the

northbound carriageway (towards Pretoria), will commence on 12 October 2008. Northbound traffic will be deviated onto

lanes situated to the right of the existing road. Construction along the northbound carriageway is expected until end

2009, after which traffic will be reinstated to its original position.

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page4

N1 PRETORIA

Roadworks - right hand lane closed between the N4 Highway Interchange and the Lynnwood Road bridge

N1 RIGEL AVENUE / ATTERBURY ROAD (PRETORIA)

Construction is in progress on the Garsfontein Road Bridge. Lane closures may be encountered.

N1 NORTH & SOUTHBOUND

Construction of additional lanes and other improvements are in progress between Atterbury Road & R21 Interchange.

Lane closures and reduced speed limits will apply.

N1 NORTH & SOUTHBOUND

Roadworks are in progress between N4 Interchange & the Zambesi Drive with lane restrictions.

MAIN ROUTES

N1 LOUIS TRICHARDT / POLOKWANE (PIETERSBURG) D14

Road in a very good condition. Pedestrians and stray animals could be encountered.

N1 POLOKWANE D14

The Nelson Mandela Interchange is closed for major road works. The is a detour route behind the motor city and clear

sign posts.

N1 POLOKWANE (PIETERSBURG) / BELA BELA (WARMBATHS) D14 / E13

Resealing operations are in progress between Bela Bela Interchange and Polokwane. Possible lane restrictions may be

encountered. Expected date of completion is April 2009.

N1 GRASMERE TOLL PLAZA G12

Incidents of stone-throwing and obstruction on the road have been reported in past years, just after the Grasmere Toll

Plaza towards Evaton (South). Beware of pedestrians. Exercise caution and be vigilant. Daytime travelling is advised.

N1 VAAL TOLL PLAZA / KROONSTAD H12

Strong winds occasionally occur in this area and can be very dangerous. Motorists and especially truck drivers are

advised to exercise caution and reduce speed in such conditions.

N1 KROONSTAD / BLOEMFONTEIN H12 / K11

The road is potholed between Bloemfontein and Verkeerdevlei toll plaza. Construction of a second carriageway between

Bloemfontein and the Verkeerdevlei toll plaza is taking place. Two lanes are open to traffic and a restriction of shoulder

width is in place. A reduced speed limit is enforced. Beware of construction vehicles. Expected date of completion is

February 2010. Beware of pedestrians and heavy vehicle activity in Ventersburg. Urban speed restrictions are in place.

N1 BLOEMFONTEIN / COLESBERG K11 / L10

The road is potholed and very uneven in places. Reconstruction of the road is in progress between Orange River bridge

and Springfontein with Stop/Go controls in operation. Delays of ± 20 minutes at a time can be expected. Expected date

of completion is October 2009.

N1 COLESBERG / THREE SISTERS M8

Construction works are in progress over a 30km section just north of Three Sisters with Stop/Go control in operation.

Three Stop/Go and traffic-light controls may be expected, with waiting periods of ± 20 minutes. Expected date of

completion is September 2009. The road is very uneven, caution is advised.

N1 THREE SISTERS/BEAUFORT WEST M7

Routine maintenance teams maybe encountered. Exercise caution

N1 LEEU-GAMKA / LAINGSBURG N6 / P5

Routine maintenance teams may be encountered. Beware of pedestrians and stray animals in the vicinity of Leeu-

Gamka.

N1 LAINGSBURG / WORCESTER P5 / P4

Beware of pedestrians and stray animals north of De Doorns.

N1 WORCESTER / HUGENOT TUNNEL P4

The road is uneven and speed restrictions are enforced. Construction works are in progress between Koelenhof

N1

BEITBRIDGE / JOHANNESBURG / CAPE TOWN

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page5

Interchange and the Hugenot Toll Plaza. Expected date of completion is December 2009.

N1 PAARL P3

Roadworks are causing heavy delays through the R304 Klipheuwel exit towards Paarl. The R101 can be used as an

alternative route.

N2 ERMELO/PIET RETIEF G14/H15

It is in a fair to poor condition. Exercise caution.

N2 PIET RETIEF / MPUMALANGA BORDER H15 / H16

Resealing and strengthening operations are in progress. Expected date of completion is end of 2010. The road is in fair

to poor condition, potholed and uneven in places.

N2 MPUMALANGA BORDER / PONGOLA H16

Roadworks are in progress. Road rehabilitation between Pongola Town and the Mpumalanga border has commenced.

Traffic will be restricted to single lane passage with Stop/Go controls in operation. Expected date of completion is May

2010.

N2 MDLOTI RIVER K16

Construction is in progress of a new interchange for the King Shaka Int. Airport north of the Mdloti River. A reduced

clearance limit for construction of the bridge deck over the N2 as well as possible deviations may be encountered.

Speed reductions are enforced. Expected date of completion is March 2010.

N2 DURBAN K16 & K15

A new project has commenced which focuses on the upgrading of the Inanada/Umgeni Interchanges. Limited impact to

the N2 traffic may be expected with occasional closure of the slow lanes and reduction in speed. Stop/Go control will be

in operation at the on-off ramps.

N2 MTHATHA / BROOKS NEK M13

Construction in progress from the Mthatha River to 22km north of the River. Stop/Go control is in operation and delays

may be encountered. Expected date of completion is November 2009. The remaining section of the road to Brooks Nek

is in a good to fair condition.

N2 MTHATHA / IDUTYWA M13 / N13

Road surface failures and potholes may occur especially after heavy rains resulting in short term road works. The road

is in a good to fair condition.

N2 IDUTYWA / KEI RIVER N13

Beware of pedestrians and stray animals. Road is in a fair to good condition.

N2 KEI CUTTINGS / BROOKES NEK N13

Extreme caution is advised. This road is in fair condition and prone to potholes after rain. Routine maintenance work

may be encountered. Special care should be exercised in the Bashee Cuttings as the road can become very slippery and

there are sharp bends. Also beware of the danger of rock falls in the Kei Cuttings. Beware of pedestrians and stray

animals. Reduced speed limits will apply.

N2 EAST LONDON / KING WILLIAM'S TOWN O12 / N12

Short term road narrowing for repairs may be encountered, especially between King William's Town and East London.

N2 KING WILLIAM'S TOWN / PORT ELIZABETH N12 / O10

At the Coega River, approximately 40km north of Port Elizabeth construction work is in progress with speed restrictions

in place. At Grahamstown, as slip in the road cutting has caused narrowing of the grahamstown bypass. Repairs are in

progress with road narrowing and speed reductions. Expected date of completion is April 2009 (Grahamstown) and May

2010 (Coega). The remaining section of the road is in fair condition but prone to potholes in the vicinity of Peddi.

N2 VAN STADENS RIVER / THORNHILL / JEFFREYS BAY O10 / P9

Road is in a fair condition. Road works are in operation between Gamtoos River and Van Stadens River. Two Stop/Go

controls are in operation and delays of ± 15 minutes at a time can be expected. Speed restrictions are enforced.

N2 STORMSRIVER / HUMANSDORP O8 / P9

Reconstruction is in progress for the first 14km from Stormsriver to Humansdorp. Speed restrictions are enforced.

Traffic is being deviated onto a bypass and Stop/Go controls are in operation. Delays may be encountered. Beware of

pedestrians in the vicinity of Stormsriver bridge. Expected date of completion is February 2010.

N2

ERMELO / DURBAN / CAPE TOWN

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page6

N2 KNYSNA / GEORGE P8 / Q7

The road is in good condion with the exception of the section between Knysna Lagoon Bridge and Knysna Town. From

the Knysna Lagoon Bridge to Knysna town the road is uneven and very narrow with no overtaking opportunities. Routine

maintenance teams may be encountered. Beware of pedestrians and stray animals in the vicinity of Knysna Lagoon.

N2 CALEDON / BOTRIVER Q4

Construction works are in progress between Botriver and Caledon over a 30km section. 3 Stop/Go controls are in

operation with waiting periods of ± 15 minutes at a time. Expected date of completion is October 2009.

N2 SIR LOWRY'S PASS Q3

Frequent poor visibility experienced. Exercise caution at all times. Off-peak roadworks may be encountered with lane

closures and delays. The road between Somerset West and Bot River is in fair condition.

N3 HARRISMITH / VAN REENEN J14

Due to steep gradients, sharp curves, mist and strong winds, motorists are advised to exercise extreme caution at Van

Reenen's Pass.

N3 TUGELA TOLL PLAZA / FRERE J14

Road and concrete repair works are in progress. Possible delays and speed restrictions may be encountered. Expected

date of completion is February 2010.

N3 HOWICK / NOTTINGHAM ROAD K15

Rehabilitation works are in progress. Expected date of completion is April 2010.

N4 RUSTENBURG / BRITS F12

Beware of pedestrians and stray animals in the Bapong area.

N4 WITBANK / MIDDELBURG F14

Early mornings and late afternoons mist and fog which make visibility very poor. Motorists are advised to exercise

caution and to use their headlights and increase following distances. .

N4 WONDERFONTEIN / BELFAST F14 / F15

Rehabilitation is in progress and lane closures and delays may be encountered. Expected date of completion is August

2009.

N5 HARRISMITH / BETHLEHEM J14 / J13

The road is in a fair to good condition but is potholed in places. Various potholes can currently be encountered between

Bethlehem and Kestell. During the wet season occasional potholes may be encountered and routine short term

maintenance work as a result.

N5 BETHLEHEM / WINBURG J13 / J11

The road is in a fair to good condition. Beware of pedestrians in the Paul Roux area. Rehabilitation between Senekal

and Vaalpenspruit (half way towards Winburg) are in progress. Two-way traffic without any overtaking opportunity

together with speed restrictions will be in place. Rehabilitation works with similar restrictions can be expected between

Vals River (near Bethlehem) and Paul Roux from January 2009. Stop/Go controls will be operation for asphalt patching

work.

N5 BLOEMFONTEIN/THABA NCHU/LESOTHO BORDER K11/K12

Beware of stray animals. The section between Tweespruit and Ladybrand is in fair condition and patching operations

are in progress. Short delays may be encountered. Stop / Go controls are in operation with delays of less than 5min at

a time. Rehabilitation has commenced between Tweespruit and Ladybrand.

N3

JOHANNESBURG / DURBAN

N4

NEW BAKWENA PLATINUM HIGHWAY: ZEERUST / KOMATIPOORT

N5

WINBURG / HARRISMITH

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page7

N6 BLOEMFONTEIN/ALIWALNORTH K11/L11

The section between Smithfield and Reddersburg is in poor condition. Routine maintenance work and patching

operations are also in progress in this section. Stop/Go control is in operation. Please adhere to designated signs and

reduced speed limits. Construction between Smithfield and Paryshoogte to commence in February 2010.

N6 QUEENSTOWN / CATHCART M11 / N12

No construction. Motorists may encounter occasional short-term closures over short sections for routine maintenance

N7 CITRUSDAL / CLANWILLIAM N4 / N3

20km North of the Piekenierskloof Pass, the road is uneven and potholed. Repairs have been made but routine

maintenance work is still in progress. The road is in fair condition.

N7 CLANWILLIAM / GARIES N3/ J2

The road is in a fair to good condition.

N7 GARIES / VIOOLSDRIFT L2 / J2

Beware of pedestrians and stray animals in the vicinity of Okiep and Steinkopf. Routine maintenance teams may be

encountered.

N8 GROBLERSHOOP/KIMBERLEY J7/J9

Routine maintenance teams may be encountered. Beware of stray animals along the route.

N8 GROBLERSHOOP / BLOEMFONTEIN J6 / J9

The road is in fair condition. Occasional maintenance works may be encountered.

N8 KIMBERLEY / BLOEMFONTEIN J9 / K11

The road is in fair condition. Maintenance works are continuous throughout this route. Stop/Go controls will be in

operation with delays of less than 5min at a time. Rehabilitation has commenced between Kloofeinde and De Brug.

N8 BLOEMFONTEIN K11

A new project for the construction of the Bloemfontein Airport Interchange is planned to commence in December 2008.

Deviations will be in place, diverting traffic on new ramps during construction of the overpass bridge. Signposts will be

erected to guide motorists.

N8 BLOEMFONTEIN / THABA NCHU / LESOTHO BORDER K11 / K12

Beware of stray animals. The section between Tweespruit and Ladybrand is in fair condition and patching operations are

in progress. Short delays may be encountered. Stop / Go controls are in operation with delays of less than 5min at a

time. Rehabilitation is scheduled to commence in June 2009 between Tweespruit and Ladybrand.

N9 COLESBERG / NOUPOORT L10 / M9

Sections between Noupoort and Hugoslaagte Station are very narrow with narrow bridges. Overtaking areas are limited

and the road is potholed in places.

N9 GRAAFF-REINET / MIDDELBURG N9 / M9

Rock falls may occur in the passes. Construction works are in progress with resealing operations and stabilizing of

slopes. Extensive Stop/Go controls will be in operation. Reduced speed limits will apply and delays may be expected.

Speed reductions will apply. Expected date of completion is July 2009. The road approximately 10km north of Graaff

Reinet is very uneven.

N9 WILLOWMORE / GRAAFF-REINET O8 / N9

The road is in a fair to good condition. No construction is in operation but routine maintenance may be encountered

N6

BLOEMFONTEIN / EAST LONDON

N7

CAPE TOWN / VIOOLSDRIFT

N8

KIMBERLEY / MASERU

N9

COLESBERG / UNIONDALE

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page8

resulting in short delays.

N10 PATERSON / COOKHOUSE O10 / N10

Beware of high pedestrian activity at the above intersections. Exercise caution and adhere to speed restrictions.

Road is in a fair to good condition.

N10 COOKHOUSE / CRADOCK N10

The road is in a fair to poor condition.

N10 CRADOCK / MIDDELBURG N10 / M10

Construction work in progress between Cypress Grove and the Conway intersection. Bypassrs are being constructed.

Stop/Go controls are in operation and short delays may be expected. Reduced speed restriction of 60km/hr will apply

over the 17km. Expected date of completion is June 2010.

N10 LUDLOW / HANOVER M9

The road is in a fair condition between Ludlow (located at the intersection of the N10 and N9) and Hanover.

N10 GROBLERSHOOP / UPINGTON J6

The road is in a fair to good condition.

N11 LADYSMITH / NEWCASTLE J14 / H14

The road is potholed in places. Patching and pothole repairs may be encountered around Fort Mistake.

N11 NEWCASTLE / VOLKSRUST H14

The road is uneven in places. Be cautions when driving through the Laingsnek (Majuba) Pass. The road is winding and

has sharp bends and steep descents. It is very dangerous in wet conditions.

Construction between Ngogo Station and Majuba Pass (Laigns Nek) is in progress. One way traffic through construction

areas with Stop/go controls in operation. Delays of ± 15min at a time may be expected.

Rehabilitation is in progress on the section between Ngogo Station and Kwaggasnek. Stop/Go controls are in operation

with ± 15min delays at a time.

N11 VOLKSRUST / ERMELO H14 / G14

Construction is in progress between Volksrust and Amersfoort. 5 Stop/Go controls are in operation with ±20 minute

delays at a time. Reduced speed limits are imposed.

Construction and road rehabilitation are in progress between Amersfoort and Ermelo with Stop/Go controls in operation.

Blasting operations and possible road closures are expected on some Sundays resulting in 2 hour delays. Expected

date of completion is September 2010.

N11 ERMELO / MIDDLEBURG G14 / F14

The road in good condition but potholed in places. Erosion does exist in some places on the gravel shoulders. Exercise

caution.

N11 MIDDELBURG / GROBLERSDAL F14

Resealing operations are in progress with special maintenance on portions from Loskop Dam to Roedtan. Expected date

of completion is August 2009.

N11 GROBLERSDAL / MARBLE HALL F14 / E14

The road is fair to poor condition and uneven in places. A reconstruction project is in progress. Delays of approximately

20 min at a time may be expected. Expected date of completion is August 2009.

N11 MARBLE HALL / POTGIETERSRUS E14

The road is fair to poor condition and uneven in places. A reconstruction project is in progress. Delays of approximately

20 min at a time may be expected. Expected date of completion is August 2009.

N12 WITBANK / OGIES F14 / G14

Early morning fog is a major problem which could result in temporary road closures. Concrete repairs have been

N10

NANACHA (NCANARA) / UPINGTON

N11

LADYSMITH / GROBLERSBRUG

N12

WITBANK / JOHANNESBURG / KIMBERLEY / CAPE TOWN

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page9

completed, road markings are still in progress. Resealing operations are under way between Delmas and Ogies.

N12 / R54 INTERSECTION @ POTCHEFSTROOM G12

The road is in fair condition. Resealing and maintenance operations are in progress. Lane closures may be

encountered.

N12 POTCHEFSTROOM / KLERKSDORP G12 / G11

Resealing operations are in progress. Lane closures may be encountered.

N12 WOLMARANSSTAD / BLOEMHOF / CHRISTIANA / WARRENTON H10 / J9

The road between Bloemhof and Wolmaransstad is in fair to poor condition and uneven in places. From Christiana to

Bloemhof the road is in fair to poor condition and uneven in places. The road is being reconstructed and widened

between Bloemhof and Beefmaster, with 2 Stop/Go controls in operation. Delays of 20 minutes at a time may be

expected. Reduced speed limits may apply.

N12 WARRENTON / KIMBERLEY J9

Construction is in progress with approximately 3 Stop/Go controls in operation. Delays of 15 minutes at a time may be

encountered. Expected date of completion is June 2009.

N12 KIMBERLEY J9

The section of Bultfontein Road between North Circular & New Main Streets, has been closed indefinitely due to

subsidence of the Big Hole. Alternative routes are clearly signposted.

N12 KIMBERLEY / STRYDENBURG J9 / K8

Road is in a fair to good condition but becomes bumpy between HOPETOWN / STRYDENBURG.

N12 VICTORIA WEST/THREE SISTERS M8

Road is in a fair to good condition. Beware of routine maintenance teams/work which can result in short-term road

closures

N14 KRUGERSDORP / CARLETONVILLE G12

The road is closed due to a sinkhole that developed between the two Carletonville exits. A bypass is in operation and

signposted. The road is in poor condition and uneven in places.

N14 VENTERSDORP / COLIGNY G11

The road is in poor to fair condition.

N14 COLIGNY / DELAREYVILLE G11 / G10

The road has deteriorated badly, is in poor condition and potholed in places. Exercise caution.

N14 DELAREYVILLE / VRYBURG G9 / G10

The road is in fair condition. Exercise caution.

N14 POFADDER / OLIFANTSHOEK K4- H7

The road is in good condition, routine maintenance may be encountered.

N14 POFADDER / SPRINGBOK K4 / K2

Road is in a good condition. Beware of pedestrians and stray animals.

N17 SOWETO / NASREC G13

Construction works are in progress between Warmerburn and Nasrec. Expected date of completion is December 2009.

N14

KRUGERSDORP / UPINGTON / SPRINGBOK

N14 VRYBURG H2

Road works near Lysko between Vryburg and Kuruman

N17

JOHANNESBURG / ERMELO

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page10

N17 SPRINGS / LEANDRA G13

Construction on road widening and asphalt overlay is in progress between Leandra and Springs. 3 Stop/Go controls are

in operation with delays of 15 minutes at a time. Expected date of completion is July 2009.

N17 LEANDRA / BETHAL G13 / G14

Motorists are advised to exercise caution as the road carries heavy volumes of traffic and road signs are very poor. The

road is narrow and, overtaking areas are limited. The road is in fair to poor condition and uneven in places. Construction

on new alighment is in progress between Leandra and Kinross. Delays may be encountered. Expected date of

completion is December 2010.

N17 BETHAL / ERMELO / OSHOEK BORDER POST G14 / G15

The road is in fair to poor condition, uneven and potholed in places. Beware of stray animals.

N18 HARTSWATER / WARRENTON H9 / J9

Beware of pedestrians and stray animals.

PROVINCIAL ROUTES

R21 KEMPTON PARK G13

Roadworks are in progress near the Bapsfontein Road off-ramp.

R22 HLUHLUWE / FARAZELA (BORDER WITH MOZAMBIQUE) J17 / G17

The road is in an even-handed to good condition with a 2 lane carriageway road being paved all the way through.

Caution is advised.

R23 HEIDELBERG / STANDERTON / VOLKSRUST G13 / H14

The road is in a variable but fair condition and potholed in places. Exercise caution.

R25 GROBLERSDAL / BRONKHORSTSPRUIT F14 / F13

The road is potholed. Caution advised and patching operations are in progress.

R25 BRONKHORSTSPRUIT / BAPSFONTEIN / BENONI F13 / G13

The road has subsided and is in fair to poor condition. Exercise caution.

R25 VERENA/GROBLERSDAL F14

The road is in a fair to poor condition. Potholed in places. Exercise extreme caution.

R26 VILLIERS / REITZ H13

The road is potholed and in fair to poor condition. Exercise caution. Be cautious and adhere to signs when approaching

the R34 crossing near Frankfort. Night time driving is not recommended.

R26 FICKSBURG / CLOCOLAN J12

The road is in poor condition. Routine maintenance operations are in progress.

R26 LADYBRAND / HOBHOUSE K12

The road is potholed and in poor condition, and road markings are very poor.

R26 HOBHOUSE / WEPENER / ZASTRON K12 / L12

Continuous maintenance works are in progress. Possible delays may be encountered. Obey all designated road signs.

R27 NIEUWOUDTVILLE / CALVINIA M4

Road surface is deteriorating and is in fair condition. Caution is advised as trucks with abnormal loads frequent this

route. Routine maintenance teams may be encountered.

R27 KEIMOES/KENHARDT/BRANDVLEI/CALVINIA/VANRHYNS PASS J6/K6

Ongoing routine maintenance is taking place with possible delays. Exercise caution.

R30 WELKOM / BRANDFORT H11 / J11

Sections of the road are in poor condition. Exercise caution. Upgrading of the road is in progress between Brandfort and

Vet River bridge. Stop/Go controls are in operation. Delays may be encountered. Expected date of completion is

August 2010. The R30 and R34 between Bloemfontein and Kroonstad (via Brandford and Welkom) were officially named

the ZR Mahabane Toll Road.

N18

MAFIKENG / WARRENTON

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page11

R31 RIETFONTEIN / ANDRIESVALE / VAN ZYLSRUS KURUMAN G5 / H8

Road is corrugated in places and very dusty. Beware of graders between Kuruman and Van Zylsrus. The section

between Van Zylsrus and Askham is in reasonable to good condition. The section from Andriesvale / Inkbospan to

Rietfontein is tarred for 40 km. The rest of the road to Rietfontein is still gravel. Exercise caution.

R33 BELFAST/WARBURTON/ PIET RETIEF G15/F15

The road is in a fair condition. Uneven and potholed in places. Exercise caution.

R33 TUGELA FERRY / GREYTOWN K15 / J15

Beware of pedestrians and stray animals. Exercise caution.

R34 VRYBURG / SCHWEIZER-RENEKE G9 / H10

The road is badly potholed. Exercise caution.

R34 BLOEMHOF / HOOPSTAD H10

The road is in poor condition. Exercise caution.

R34 HEILBRON / KROONSTAD H12

The road is potholed in places. Exercise caution.

R34 HEILBRON / FRANKFORT / MEMEL H12 / H14

Sections of the road are in poor condition. Exercise caution.

R34 MEMEL / BOTHA'S PASS H14

The road is badly potholed and in poor condition.

R34 BOTHA'S PASS / NEWCASTLE H14

The road is badly potholed in places. Exercise caution.

R35 MIDDELBURG / AMERSFOORT F14 / H14

The road is in fair to poor condition. Exercise caution.

R36 TZANEEN / MACHADODORP D15 / D14

The road is in fair condition and potholed in places. Lane markings are poor. Exercise caution.

R37 POLOKWANE / LYDENBURG D14 / F15

The road is in variable but generally fair condition and potholed in places. Beware of stray animals. Exercise caution.

R37 NELSPRUIT/BURGERSFORT F15/E15

The road is in a variable but fair condition. Potholed in places. Exercise caution.

R38 KAAPMUIDEN/STANDERTON G14

Kaapmuiden/Barberton/Carolina/Hendrina/Bethal –Fair to Poor. Uneven and potholed in places. Exercise caution.

Bethal/Standerton –The road has deteriorated badly and in very poor condition and uneven in places. Speed restrictions

are strictly enforced between Bethal and Standerton.

R40 KLASERIE / WHITE RIVER E16 / F16

The road is in fair condition.

R40 NELSPRUIT / BARBERTON F15 / F16

Major rehabilitation of the road is in progress. The remaining portion of the route from Hilltop Pass to Baberton is still

being reconstructed. Stop/Go control in operation and delays of 20 minutes at a time may be encountered. Blasting

operations will result in a longer delay. Expected date of completion is June 2009.

R42 DELMAS / NIGEL / HEIDELBERG G13

The road surface between Nigel and Delmas has been repaired. Road markings are still under way. Caution is advised.

Roads in Delmas are in poor condition.

R44 PAARL P3

The on-ramp to the N1 outbound carriageway is closed for road works at the Klapmuts Interchange.

R45 FRANSCHHOEK PASS P4

The Franschhoek pass has been reopened to traffic.

R50 BAPSFONTEIN / DELMAS G13

The road is in fair to good condition but potholed for the section covering 15km before Delmas to Delmas town. Exercise

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page12

caution. Roads in Delmas are in poor condition.

R50 LEANDRA / STANDERTON G13

The road is in poor condition and potholed. Exercise caution.

R51 SPRINGS / NIGEL / BALFOUR G13

The road is potholed. Exercise caution.

R54 VEREENIGING / VILLIERS G12 / H13

The road has subsided. Exercise caution, especially in wet weather. Routine maintenance is in progress.

R56 Mt. FLETCHER / MATATIELE L13

Routine maintenance work is in progress.

R57 PETRUS STEYN / REITZ / KESTELL H13 / J13

Construction is in progress on this road with a gravel deviation in use between Petrus Steyn and Reitz. The rest of the

road to Kestell is potholed in places, and road markings are poor. Exercise caution.

R58 ALIWAL NORTH / BARKLY EAST L11 / L12

The road is potholed in places. Exercise caution.

R58 BARKLY EAST / ELLIOT L12 / M12

The condition of this road has deteriorated, and the section between Aliwal North and Barkly East is potholed. Exercise

caution.

R60 SWELLENDAM / ASHTON Q5 / P5

The road is potholed in places. Exercise caution.

R61 BETHESDAWEG / CRADOCK / QUEENSTOWN M9 / M11

No construction in progress but occasional short term road closures may be encountered as a result of routine

maintenance.

R61 COFIMVABO/NGCOBO M12/M12

Motorists to be aware of pedestrians and stray animals.

R61 MTHATHA / PORT ST JOHNS M13 / M14

Road is in a fair to reasonable condition. Beware of rock falls, especially in wet weather. Reduced speed limits of

60km/h have been imposed through sections which require maintenance.

R61 PORT ST JOHNS / LUSIKISIKI M14

Exercise caution, as this road become slippery in wet weather. Rockfalls are also possible in wet weather.

R61 BROOK'S NEK / MAGUSHENI / BIZANA / MZAMBA M14 / L14

The road is in reasonable condition. The road is very winding.

R62 CALITZDORP / LADISMITH P6

Construction is in progress with Stop / Go in operation in the Huisrivier Pass.

R63 MIDDLEDRIFT / ALICE N11

Reconstruction of the entire section is in progress with robot control and deviations in use.

R63 ALICE / KING WILLIAM'S TOWN N11 / N12

The condition is fair from King William's Town to Dimbaza, but beyond that the tarred surface has deteriorated. Beware

of stray animals. Construction is in progress with Stop/Go control in operation.

R63 KING WILLIAM'S TOWN / STUTTERHEIM N12

6 Kilometres from King William's Town towards Stutterheim the road is narrow.

R64 GROBLERSHOOP / KIMBERLEY J6 / J9

Road known as national road number 8 (N8). Please refer to the N8 section for more information.

R68 DUNDEE / MELMOTH J15 / J16

The road is uneven in places. Exercise caution.

R71 GRAVELOTTE / PHALABORWA D15 / D16

The road is in fair condition and potholed in places. Exercise caution.

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page13

R72 PORT ALFRED / KENTON-ON-SEA O11

Roadworks are in progress. Stop/go controls are in operation. Delays may be encountered.

R74 HARRISMITH /WINTERTON J14

The road is badly potholed the section through Oliviershoek Pass is not recommended for night time driving.

R81 SEKGOPA / MOKETSI D15

The road is in fair condition and potholed in places. Exercise caution.

R101 POLOKWANE / MOKOPANE D14 / E14

Construction of the load control centre near the ultra city.

R101 MOKOPANE / MOOKGOPONG E13

The road is in a fair to good condition.

R102 PARK RYNIE / PENNINGTON E13

The Kelso bridge between Park Rynie and Pennington has been washed away. There is virtually no signtage to warn

motorists that the road is closed and unpassable at this point. The last reachable establishment if travelling on the R102

South from Park Rynie is the Happy Wanderers Caravan Park. Visitors to any establishment which is situated between

the Kelso bridge and Pennington on the R102 is advised to take Exit 93 to Pennington to reach their destination. Please

see Anexure A, which can be found on the last page of the road report, for more a map.

R104 PRETORIA / BRONKHORSTSPRUIT F13

The road is potholed and in fair to poor condition. Exercise caution.

R300 SWARTKLIP INTERCHANGE TO STELLENBERG INTERCHANGE p3

Construction works are in progress. Two lanes of traffic will be maintained, but reduction of lanes for short sections may

be encountered. Expected date of completion is June 2010. Road works in progress between Delft and Brackenfell,

motorist are advised to obey reduced speed limit and driver with care. Off-peak roadworks may be encountered with lane

closures and Stop/Go control. Bridge construction is also in progress just north of Stellenbosch

R303 CERES / MIDDELBERG PASS / CITRUSDAL P4

The gravel section of the road is badly potholed and in poor condition. The road has short, sharp curves. Travelling with

caravans or heavy vehicles is not recommended.

R317 BREDASDORP / STORMSVLEI Q5

The road has subsided at the railway crossing. Exercise caution.

R325 POSTMASBURG / GRIEKWASTAD J8

Road is fair to poor condition. Graders may be encountered.

R328 OUDTSHOORN / SWARTBERG PASS / PRINCE ALBERT P7

The road has sharp bends and steep descents. It is not recommended for caravans and trailers. The road is open to

light motor vehicles only and is strictly weather permitting.

R331 WILLOWMORE / BAVIAANSKLOOF / PATENSIE O8 / O9

Road is narrow, steep and in poor condition. Travelling with light motor vehicles, caravans and heavy vehicles are not

recommended. High clearance or 4x4 vehicles only.

R339 AVONTUUR / KNYSNA (PRINCE ALFRED'S PASS) P8

The road is narrow and winding. Extreme caution advised. This road is extremely dangerous in wet weather and road

closures may then be encountered.

R346 ZWELITSHA / MOUNT COKE / KIDD'S BEACH N12

Beware of stray animals.

R351 KATBERG / WHITTLESEA N11

This gravel road is in poor condition not recommended.

R358 POFADDER / ONSEEPKANS K4 / J4

The gravel section of this road to the Namibian border is in a good condition and graded regularly.

R76 KROONSTAD / LINDLEY / BETHLEHEM H12 / J13

The has a very uneven road surface and is potholed in places. It is in poor condition with poor road markings. Routine

maintenance work is in progress with patching operations.

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page14

R360 ANDRIESVALE / TWEE RIVIEREN G5

These roads deteriorate rapidly, especially during the dry seasons. It is in poor condition. Construction is in progress.

Expected date of completion is mid 2009. Alternative route to the Park is via Botswana through the Bokspits Border Post.

High clearance vehicles are recommended in the Park.

R364 PAKHUIS PASS N4

The road surface is very bad. Exercise caution.

R369 PRIESKA / HOPETOWN K7 / K9

This road is in poor condition. Beware of graders.

R372 TAUNG / REIVILO H9

Road is in a reasonable condition. Beware of stray animals. Night driving is not recommended.

R384 BRITSTOWN / VOSBURG / CARNARVON L8 / L7

The road is now tarred between Britstown and Vosburg. The road from Vosburg to Carnarvon is in a reasonable

condition.

R385 CAMPBELL / DOUGLAS / HOPETOWN J8 / K9

Road is in reasonable condition. Construction and tarring operations are in progress the first 3 km from Douglas towards

Campbell. Exercise caution.

R392 LADY GREY / DORDRECHT J12 / M12

The road is in poor condition. Exercise caution.

R396 MACLEAR / NAUDE'S NEK / RHODES / BARKLY EAST M13 / L12

The gravel road is narrow but in fair condition. Rock falls occur occasionally, especially during wet weather.

Recommended speed is 30 –40 km/hr.

R503 HARTBEESFONTEIN / ROOIGROND G11 / F10

The road is in poor condition. Exercise caution.

R504 WOLMARANSSTAD / SCHWEIZER-RENEKE H10

The road is potholed in places. Exercise caution.

R505 LICHTENBURG / OTTOSHOOP G11 / G10

The road is badly potholed and in poor condition. Exercise caution.

R507 OTTOSDAL / DELAREYVILLE G10

The road is in poor condition. Exercise caution.

R510 THABAZIMBI / ELLISRAS E12 / D12

The road is in good condition.

R511 FOURWAYS / N14 INTERCHANGE (DIEPSLOOT SETTLEMENT) G12

Beware of pedestrians and stray animals. The road is potholed in places.

R515 CULLINAN –R25 JUNCTION F13

The road is potholed in places

R516 BELA BELA / THABAZIMBI E13 / E12

Roadworks are in progress from the N1 off-ramp onto the R516 to Bela Bela. A deviation is in use and Stop/Go controls

are in progress. Delays of ± 20 min at a time can be expected. The rest of the road from Bela-Bela to Thabazimbi is

potholed in places.

R518 POTGIETERSRUS / MARKEN E14 / D13

Sections of the road are in poor condition. Exercise caution and obey all designated road signs.

R521 POLOKWANE (PIETERSBURG) / DENDRON / VIVO D14

The road is in fair condition.

R523 VIVO / MASEKWASPOORT D14 / C14

The road is in fair condition.

R524 LOUIS TRICHARDT / THOHOYANDOU D14 / C15

Beware of stray animals. High grass reduces visibility.

R526 GRAVELOTTE / MICA D15 / E15

Resealing operations are in progress. Expected date of completion is May 2009.

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page15

R540 BELFAST / LYDENBURG F15

The road through Lydenburg is potholed. Exercise caution.

R543 VOLKSRUST / WAKKERSTROOM / PIET RETIEF H14 / G15

Beware of stray animals. The road is potholed.

R545 BETHAL –KRIEL / OGIES G14

The road is potholed for the first few km from Bethal. The remaining section is under construction with no lane markings.

R546 KINROSS / STANDERTON G14

The road is badly potholed. Patching operations are in progress with Stop/Go control in operation.

R547 KINROSS / GREYLINGSTAD G14 / G13

The road is potholed. Exercise caution.

R553 GOLDEN HIGHWAY G12

Incidents of stone throwing have previously been reported on the road just after the Grasmere Toll Plaza towards Orange

Farm / Sebokeng.

R555 OGIES/ WITBANK/MIDDELBURG G14 / F14

The road is in fair condition and badly potholed. Exercise caution. Early morning fog is a major problem in this area.

R555 MIDDELBURG / STOFFBERG / STEELPOORT / ORIGSTAD F14 / E15

The road is in fair to condition. Exercise caution.

R568 BRONKHORSTSPRUIT / EKANDUSTRIA F13

The road is badly potholed. Exercise caution.

R570 MALELANE / JEPPE'S REEF F16

The road is in fair condition and uneven in places. Exercise caution.

R571 KOMATIPOORT / MANANGA F16

The road is in fair condition and uneven in places. Exercise caution.

R572 MONTE CHRISTO / TOM BURKE D13

The road is in fair condition and uneven in places.

R576 CODRINGTON / SETTLERS F13 / E13

The road is badly potholed and damaged. Exercise caution.

R577 ROOSSENEKAL / LYDENBURG F14 / F15

The road is in reasonable condition with a few potholes.

R617 KOKSTAD / FRANKLIN L14

Sections of the road are without lane markings. Exercise caution.

R622 GREYTOWN / MOOI RIVER K16 / K14

A detour of approximately 500 metres on this road due to a sinkhole that previously developed. Exercise caution.

R703 CLOCOLAN / EXCELSIOR J12

The road is potholed and in poor condition. Exercise caution.

R708 MARQUARD / CLOCOLAN J12

The road is potholed with poor road markings.

R709 EXCELSIOR / TWEESPRUIT J12 / K12

The road is potholed and in poor condition.

SABIE/CYBELE FOREST LODGE (MPUMALANGA) F15

This gravel road is in poor condition. Exercise extreme caution.

WEPENER / THABA NCHU (FREE STATE) K12 / K11

This gravel road is in poor condition.

OTHER ROADS –NO ROUTE NUMBERS

Automobile Association of South Africa PO Box 30926 Braamfontein 2017 Tel: 083 843 22 www.aa.co.za

Page16

JOZINI / MBAZWANA (KWAZULU NATAL) H17

The condition of the road is reasonable. Exercise caution, especially during wet weather.

JOZINI / EMANGUZI (KWAZULU NATAL) H17

The road is in poor condition. Beware of stray animals.

SANI PASS (KWAZULU NATAL) K14

The road is tarred for the first few kilometres from Himeville –thereafter it is a dirt road. Recommended for high

clearance vehicles only and strictly weather permitting.

O'KIEP / CONCORDIA (NORTHERN CAPE) K2

This road is in a poor condition. Exercise caution.

ALEXANDER BAY / RICHTERSVELD (NORTHERN CAPE) J1

The road is in poor condition. High clearance vehicles are recommended.

ELLIOTDALE / COFFEE BAY (EASTERN CAPE) M13 / M14

The road is in reasonable condition from Elliotdale turn-off to Umtata Mouth turn-off. The road is potholed.

GEELBEK / LANGEBAAN (WESTERN CAPE) P3

The road now belongs to the National Parks Board and is closed to the public.

BLANCO ROAD - GEORGE (WESTERN CAPE) P7

The section of the road between the N2 Highway and the Airport via Blanco has been closed or bridge repairs.

Diversions are in operation for passenger vehicles. Trucks are being re-routed via central George.

NB: Caution is recommended on all gravel roads to the coastal resorts in the Eastern Cape, as they can become very

slippery and dangerous in wet weather and there conditions are their condition become very poor.

DISCLAIMER

This Road Report, compiled and issued by the AA, is based on information collected and received from various external sources such

as road, traffic and police authorities, contractors responsible for road maintenance, and AA members. Travellers should remember that

weather conditions and other factors can quickly affect road conditions and the report could therefore change unexpectedly.

The AA takes all reasonable steps to ensure the information is correct and up to date. However, we cannot accept responsibility for any

omissions or errors in it, nor are we responsible for damage, delays or disappointment that might occur during the course of your